1. Place Your Order And Site Check:
Select the hot tub model that fits your space and needs. Because each unit is prepared specifically for you, we kindly request that you provide a short video of the route the delivery team will take, from the kerbside where the delivery vehicle will pull up to the final location where the hot tub will be installed. Please include any gate and pathway widths, height restrictions, turns, steps, and walls that may be encountered during the route. This helps us confirm access for the delivery vehicle (truck, HIAB/crane, or pallet-lift) and ensures the hot tub can be placed correctly upon arrival. Once we have this, we will send you an order confirmation with all the details.
2. What To Do If Access Is Limited (Please Read).
In situations when access is minimal, a crane may be required to position your hot tub. We recommend discussing this possibility with our sales team before contacting a crane company.
It is your responsibility to organise the lifting equipment required, as a local company would be able to visit and conduct any necessary site assessments. During positioning of the hot tub, the health and safety measures, as well as site assessment, it is the responsibility of the crane provider."
3. Manufacture & Preparation:
Upon order confirmation, your selected hot tub is scheduled for manufacture or allocation. The product is built to our high standards, incorporating insulation, jets, audio/lighting features, as well as external finishes, as specified in your selected model. Quality control checks are conducted before dispatch.
4. Delivery Scheduling:
Once the hot tub is ready, we arrange a delivery date to your address. This is an all-day appointment, and you will be called approximately one hour before the delivery team's arrival.
5. Site Preparation:
Before delivery, you will need to prepare:
A level and stable base suitable for the hot tub’s weight and use.
Clear access routes for the delivery vehicle and unloading equipment. Pathway widths to be a minimum of 50mm wider than the depth of the tub. I.e., Tub depth 830mm, pathway width required 880mm minimum. Height restrictions must be at least 200mm above the height of the tub when it is on its side. I.e., a tub size of 2100 x 2100 means there is no height restriction below 2300mm.
6. Electrical Supply:
13 Amp hot tubs:
An outdoor, RCD-protected socket, located 2 to 3 Metres from the hot tub, is required and should be connected to the consumer unit with a suitable 2.5mm 3-core heavy-duty outdoor cable with a sealed on plug.
The cable supplied must be long enough to extend from the power supply location to the desired location of the hot tub control panel, covering the floor and reaching the tub. It is recommended that you prepare at least 1 metre of extra cable to ensure it can comfortably reach the components.
32 Amp hot tubs:
Hot tub models powered by a 32-AMP supply must be wired directly into a waterproof, rotary isolator switch.
A qualified electrician must install an IP65-rated, waterproof isolator located 2 to 3 Metres from the hot tub.
This should be connected to the consumer unit with a three-core 6mm armoured cable. Connected to the isolator switch should be another 6mm armoured cable, which is long enough to extend from the isolator switch to the floor, across the floor, and around the tub from the location of the power supply to reach where you require the hot tub control panel to be located. We recommend that you prepare at least 1 metre of extra cable to ensure that it can comfortably reach the components.
The electrical installation should be certified to Part P of the Building Regulations and BS 7671 of the Wiring Regulations. Please have a qualified electrician assess and install the dedicated circuit, isolator, RCD protection, or supply as required for your model.
7. Water supply & drainage: Ensure there is suitable access to water supply and drainage if required.
Please ensure you have read all the manuals provided in the Resources tab to prepare your Hot tub most efficiently.
8. Delivery & Inspection
On delivery day, the hot tub will arrive as arranged. This is an all-day appointment, and you will be called approximately one hour before the delivery team's arrival.
Please inspect the unit immediately for any visible damage or missing parts. Report any issues within 24 hours of delivery so that warranty coverage remains valid. The hot tub is now at your site and ready for the next step.
9. Installation / Setup
Full delivery and installation are included as standard.
Your hot tub will be delivered by our experienced two-person team, who will position it in the agreed location, unwrap and inspect it, assemble the steps, fit any accessories (cover lifter, cover, etc.), and connect it to the pre-installed electrical supply (which must meet our specifications).
The control box will be tested, and you’ll be guided through the basic operation of your hot tub. We do not wait for the tub to be filled, but if there is any problem starting up, please don't hesitate to get in touch with us, and we will endeavour to assist you. All packaging will be removed and taken away by our team.
8. Final Checks & Warranty Validation
Once positioned and ready:
Ensure all electrical connections have been completed to specification by a qualified electrician.
Fill the tub with water and ensure that all jets, controls, audio/lighting work correctly.
Apply any finishing treatments (e.g., protective covers, insulation checks) per the manufacturer’s requirements to maintain warranty coverage.
Perform a test soak/heat up to confirm operation.
9. Enjoy Your Hot Tub & Ongoing Support
Your hot tub is now ready for use! Sit back, relax, and enjoy your wellness retreat and hydrotherapy experience.
Should you have any questions about operation, maintenance, or access to parts/support, our team is here to help.